Buildings

–Post Template– (DO NOT DELETE)

By |2021-02-02T19:54:56+00:00February 2nd, 2021|Architecture, Buildings, Construction|

Technology is Here to Stay Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vivamus purus nisl, elementum vitae consequat at, tristique ut enim. Sed ut dignissim leo. Nullam sed metus id sapien faucibus rhoncus sed at magna. Nullam eget ornare leo, eget aliquam ante. Sed cursus malesuada fringilla. Cras porta ipsum sed nibh consectetur, a

19th Street Signal Improvements (Parking Lot N)

By |2021-02-02T19:47:28+00:00September 1st, 2014|Architecture, Buildings, Construction, News|

Tacoma Community College During the three-month summer break at Tacoma Community College, Tunista Construction performed the construction of a new 42,000 SF parking lot and a 4-chamber wide, 280-foot detention system with control structures, which included grading and repaving of the intersection and campus. TCL also performed the installation of site lighting and

Go to Top